At SCH Site Services, we thrive on challenges, and when it comes to large-scale steelwork projects, we’re always ready to rise to the occasion. Project Newton in Billingham, completed in 2022, remains a shining example of what we do best; combining precision, expertise, and collaboration to bring ambitious structures to life.
Project Newton: A Significant Development in Billingham
Project Newton was a major development for a leading pharmaceutical company, designed to expand their bio campus with a brand-new four-storey office and laboratory facility. This ambitious project, executed in collaboration with Willmott Dixon, demanded nothing short of excellence. With a staggering 900 tonnes of steel required to bring the vision to life, it was a challenge that SCH Site Services was proud to take on.
Scope of Work
Our scope of work for Project Newton included steel fabrication, steel installation, primer coat of paint, landing metal decking packs, installation of pre-cast concrete stairs, and lift shafts. These essential elements formed the foundation of the facility, ensuring both strength and longevity.
Planning for Success
Every great structure begins with meticulous planning. Our team worked for four to five months ahead of site operations, ensuring every aspect of the project was accounted for. From October 2022, we initiated the fabrication drawings, laying the groundwork for an organised and efficient build.
Delivering 900 Tonnes of Steel - One Load at a Time
Transporting and erecting 900 tonnes of steel is no small feat! This steel, the backbone of the new facility, was delivered in 54 separate loads, each carefully timed to align with the project's evolving needs. Planning and accuracy were key, ensuring that progress remained smooth and uninterrupted. We successfully delivered and installed the 900 tonnes of steel on-site in 12 weeks, meeting the contract programme requirements.
Beyond Steel: A Complete Solution
While steelwork is our specialty, SCH Site Services brings more to the table. In addition to fabricating and installing the structure, our team also handled the installation of concrete stairs and lift shafts, critical elements in ensuring the building’s functionality. Furthermore, three months after the initial phase, we returned to install a 60-tonne galvanised plant deck, adding to the project’s overall structural integrity. By offering comprehensive solutions, we reinforced our reputation as a company that delivers beyond expectations.
A Tribute to Teamwork and Excellence
Project Newton stands as the largest project we’d undertaken to date, in terms of weight, and its success remains a reflection of our expertise. The collaboration between SCH Site Services, Willmott Dixon, and the pharmaceutical company resulted in a state-of-the-art facility that met every expectation, on time and to the highest standards.
Reflecting on Our Success
Looking back, Project Newton was a milestone for SCH Site Services, proving that we have the capability to handle projects of this scale. Since its completion, we have continued to build on this success, taking on even more ambitious projects and further solidifying our reputation as industry leaders.
At SCH Site Services, we don’t just build structures, we build trust, reliability, and excellence. Project Newton remains a proud achievement in our portfolio, showcasing our ability to compete with the best in the industry, and as we continue to grow, we look forward to delivering even more remarkable projects in the future.